Project Undertaken
specialists in the field of electrical engineering engaged in electrical consultancy, electrical supervision, installation and electrical audit and electrical engineering services.
Job Done By Circulite Engineering Sdn Bhd
NO | PROJECT NAME | PROJECT LOCATION | OWNER/CLIENT | CONTRACTUAL COMMENCEMENT DATE |
1 | KERJA SERVIS DAN PENYELENGGARAAN DI MAKTAB POLIS CHERAS | MAKTAB POLIS, CHERAS | RAHZAZ ENGINEERING | 16 AUG 2013 |
2 | KERJA-KERJA KALIBRASI PROTECTION RELAY DI POWER HOUSE DAN SUBSTATION | PROTON, SHAH ALAM | PERUSAHAAN OTOMOBIL NASIONAL SDN BHD | 18 MARCH 2013 |
3 | PENATAHAN SEMULA PERALATAN ELEKTRIK UNTUK MENEPATI KEPERLUAN SURUHAJAYA TENAGA | RUMAH PAM WILAYAH HULU LANGAT | EDISI MAHIR ENGINEERING | 29 MARCH 2013 |
4 | KERJA-KERJA PENGUJIAN DAN COMMISSIONING | SAJ SEMANGGAR DALAM, KOTA TINGGI KULAI | CAHAYA ENGINEERING SDN BHD | 16 AUG 2013 |
5 | KERJA-KERJA PENGGANTIAN ELCB | PAINTING MAIN PLANT, PROTON | PROTON, SHAH ALAM | 18 MAC 2013 |
6 | PENGGANTIAN PERALATAN PROTECTION RELAY DI PH & MVF PTG | PROTON, SHAH ALAM | PERUSAHAAN OTOMOBIL NASIONAL SDN BHD | 07 MARCH 2013 |
7 | KERJA-KERJA PEMASANGAN ELEKTRIK SERTA SERVIS, PENGUJIAN DAN JUGA KALIBRASI | PNB DARBY PARK, KUALA LUMPUR | HANITEK SDN BHD | 25 FEB 2013 |
8 | KERJA-KERJA KALIBRASI OVERCURRENT & EARTH FAULT RELAY, GEGANTI ROSAK KE BUMI, GEGANTI BOCOR KE BUMI SERTA PEYELENGGARAAN TRANSFORMER | SEMASA SERVICES SDN BHD | E-POWER ENGINEERING SDN BHD | 11 JAN 2013 |
9 | KERJA PENYELENGGARAAN DAN SERVIS 11/0.433KV SUBSTATION EQUIPMENT | KOLEJ UNIVERSITY ISLAM ANTARABANGSA | MODERN NEXUS SDN BHD | 20 MAY 2012 |
10 | KERJA-KERJA PEMASANGAN DB-BOARD C/W ACCESSORIES, EFR, MCCB 100A, MCB 63A DAN ELCB 63A SERTA KALIBRASI ELR | WISMA DATO’ SANI | HANITEK SDN BHD | 1 JUNE 2012 |
11 | KALIBRASI OVERCURRENT RELAY AT MAJU JUNCTION SHOPPING COMPLEX | MAJU JUNCTION SHOPPING COMPLEX | ASM PROPERTIES SDN BHD | 21 JAN 2014 |
12 | KERJA PENGUJIAN DAN COMMISSIONING DI BANGUNAN JAIS | BANGUNAN SULTAN IDRIS (JAIS) | SYARIKAT PERNIAGAAN ISMA | 19 FEB 2014 |
13 | KERJA PENGUJIAN 33KV SWITCHGEAR DAN PROTECTION RELAY | MALAYA GLASS | GRE CONTRACTING SDN BHD | 13 JAN 2014 |
14 | KERJA PENYELENGAARAAN DAN PEMASANGAN KOMPONEN CAPACITOR BANK | MAJU JUNCTION SHOPPING COMPLEX | ASM PROPERTIES SDN BHD | 07 FEB 2014 |
15 | MEMBEKAL DAN MEMASANG TEMPERATURE CONTROLLER BESERTA SHUNTRIP COIL & MEMASANG CAPACITOR BANK | BANGUNAN SULTAN IDRIS, (JAIS) | SYARIKAT PERNIAGAAN ISMA | 16 APR 2014 |
16 | KALIBRASI SISTEM PERLINDUNGAN DAN PENYELENGGARAAN | TALISMAN PLATFORM | ENHANCE TRACSDN BHD | 28 AUG 2015 |
17 | KALIBRASI SISTEM PERLINDUNGAN DAN KALIBRASI LIMPAHAN THERMAL | PML LABUAN | HANITEK DN BHD | 02 SEPT 2015 |
18 | PENDAWAIAN SEMULA DAN REKA BENTUK ALTS , IFBT, SISTEM KAWALAN PANEL UNTUK ABB PANEL 11KV | TM , MENARA REBUNG | KEJURUTERAAN KB LETRIK SDN BHD | 6 NOV 2014 |
19 | PENGUJIAN DAN PENTAULIAHAN TRANSFORMER VOLTAN | SEMARANG PLATFORM | WEHAYA SDN BHD | 21 OCT 2015 |
20 | 33KV PILOT WIRE PERLINDUNGAN RELAY HUJUNG KE HUJUNG UJIAN DENGAN PERJALANAN DAN UJIAN BERFUNGSI | GPP – B | NEURAH RESOURCES SDN BHD | 18 JUNE 2014 |
21 | KALIBRASI MCC 415V , 6.6KV RELAY | ANGSI PLATFORM | ASAGA CORPORATION SDN BHD | 31 OCT 2015 |
22 | PENGUJIAN DAN PENTAULIAHAN ACB AND KERJA BUSBAR | FPSO BUNGA KERTAS | DATARAN ELEKTRA SDN BHD | 16 JAN 2016 |
23 | PENGUJIAN TAN DELTA DAN TRANSFORMER | PAHLAWAN POWER PLANT | ENERGY SERVICE INNOVATION (M) SDN BHD | 15 DEC 2015 |
24 | KERJA – KERJA MEMASANG DAN MEMBEKAL ACB | DATARAN PUTRA , PUTRAJAYA | JANGKA PRESTASI SDN BHD | 22 JUN 2015 |
25 | PENGUJIAN DAN PENTAULIAHAN ACB | SABAH | JENZZ MAXIMUM SDN BHD | 12 JAN 2016 |
26 | PENGUJIAN DAN PENTAULIAHAN ACB | EAST PIATU | QASK ENGINEERING SDN BHD | 3 NOV 2015 |
27 | KERJA – KERJA MEMASANG DAN MEMBEKAL ACB | PUTERI CAKEREWALA FPSO CARIGALI HESS | RA POWER PROTECTION SYSTEM SDN BHD | 17 OCT 2014 |
28 | KALIBRASI SISTEM PERLINDUNGAN DAN PENYELENGGARAAN | LRT PRASARANA KELANA JAYA | SSL DEV SDN BHD | 26 NOV 2014 |
29 | SERVICING OF SIEMENS ACB | IMPSA PORT LUMUT | ARASH ENGINEERING | 11 NOV 2014 |
30 | TO SUPPLY MANPOWER FOR OFFSHORE | EAST BERLUMUT A-BLA |
DATARAN ELEKTRA SDN BHD | 5 DEC 2014 |
31 | RECALIBRATE, BREAKDOWN AND SUPPLY MANPOWER | SEGINIAGA RUBBER INDUSTRIES | E-POWER ENGINEERING SDN BHD | 2 JUNE 2014 |
32 | 33/11KV, 45 MVA TRANSFORMER PROTECTION | MEGASTEEL | JINAS ENGINEERING SDN BHD | 9 DEC 2014 |
33 | TESTING AND CALIBRATION OF KR 1 ELECTRICAL PROTECTION RELAY | PETRONAS PENAPISAN TERENGGANU | HANITEK SDN BHD | 6 NOV 2014 |
34 | PENCAWANG HT – NO.1 (LV AUDITORIUM) | UPSI, TANJUNG MALIM PERAK | MEGAWARNI ENTERPRISE | 28 OCT 2015 |
35 | MANPOWER FOR SUMANDAK PLATFORM | SUMANDAK PLATFORM | ELECTRO DYNAMIC SDN BHD | 30 JUNE 2015 |
36 | SUPPLY MANPOWER, TOOLS EQUIPMENT AND MATERIALS | SMA MAIWP SRI PERMAISURI, KUALA LUMPUR | ALAMSHAH ROKHIZA ENGINEERING & SERVICE | 27 FEB 2015 |
37 | TESTING & COMMISSIONING | BOICON, JOHOR | ALLIED PROCESS ENGINEERING SDN BHD | 6 JAN 2015 |
38 | SERVICE OF 3.3KV INDOOR SWITCHGEAR | TANJUNG BIN POWER PLANT | ARASH ENGINEERING | 30 JUNE 2015 |
39 | MANPOWER AT SEPAT SD | SEPAT SD | ASAGA CORPORATION SDN BHD | 30 JUNE 2015 |
40 | SUPPLY MANPOWER, TOOLS AND EQUIPMENT FOR RECALIBRATION PROTECTION RELAY | MAJLIS PERBANDARAN KUANTAN | ARUSS SYNERGY SDN BHD | 12 JAN 2015 |
41 | SUPPLY MANPOWER, TOOLS AND EQUIPMENT FOR RECALIBRATION PROTECTION RELAY | MAJLIS PERBANDARAN KUANTAN | ARUSS SYNERGY SDN BHD | 12 JAN 2015 |
42 | SUPERVISION INSTALLATION SWITCHGEAR | PPNS PROJECT | DAYAMARA SDN BHD | 29 MAY 2015 |
43 | SUPPLY MANPOWER | EASTMBERLUMUT | ATCOM TECHNOLOGIES | 24 FEB 2016 |
44 | RECALIBRATION PROTECTION RELAY AND SERVICE SUB | MSN BUKIT JALIL & KG PANDAN | MEGAWARNI ENTERPRISE | 5 OCT 2016 |
45 | TRANSFORMER & SWITCHGEAR | WISMA MBSA, THEATER SHAH ALAM & KUARTERS CALADENIA SEKSYEN 20 | MEGAWARNI ENTERPRISE | 22 NOV 2016 |
46 | SUPPLY AND INSTALL | UTP TRONOH, PERAK | HANITEK SDN BHD | 5 MAY 2016 |
47 | TESTING AND COMMISSIONING | NORTHPORT | HANITEK SDN BHD | 29 SEPT 2016 |
48 | SUBSTATION SS1 | KOTA KINABALU | UNIMEKAR | 18 APRIL 2017 |
49 | VCB MOTOR FEEDER | PGB GPP5 | SIEMENS MALAYSIA SDN BHD | 24 AUG 2017 |
50 | SUPPLY AND INSTALL INCLUDING TESTING AND COMMISSIONING EARTH FAULT RELAY | KOMPLEKS B, PUTRAJAYA | SERVICE MASTER MALAYSIA SDN BHD | 27 JAN 2017 |
51 | SUPPLY MANPOWER FOR JOB AT FSO CARIGALI HESS | CAKERAWALA PLATFORM | KUASA FLEKSIBEL SDN BHD | 20 JAN 2017 |
52 | SUPPLY MANPOWER | ANGSI PLATFORM 1st MOB | NEOTECH PREMIER SERVICE SDN BHD | 22 FEB 2017 |
53 | MAINTENANCE AND SERVICING ABB 11KV CIRCUIT BREAKER | JANAMANJUNG | MY ELECTROSYSTEMS SDN BHD | 23 MARCH 2017 |
54 | TO SUPPLY DELIVERY AND INSTALL | BANK NEGARA, KUALA TERENGGANU | FATECH GLOBAL (M) SDN BHD | 30 AUG 2017 |
55 | RECALIBRATION EARTH LEAKAGE RELAY AND OVERCURRENT | PLAZA TOL LPT 2 | ABASHAH ELECTRIC & INSTRUMENT ENGINEERING SDN BHD | 19 MAY 2017 |
56 | SUPPLY AND INSTALL INCLUDING TESTING AND COMMISSIONING EARTH FAULT RELAY | KOMPLEKS B, PUTRAJAYA | SERVICE MASTER MALAYSIA SDN BHD | 27 JAN 2017 |
57 | TESTING AND COMMISSIONING | PPU SG. ABONG | ADM ENGINEERING SDN BHD | 1 JUNE 2017 |
58 | SUPPLY RING MAIN UNIT (RMU) | SELANGOR TURF CLUB | AZTECH POWER SERVICE | 3 APRIL 2017 |
59 | TRANSFORMER OIL FILTERATION | SAJ SEMBRONG | CAHAYA ENGINEERING WORKS | 23 APRIL 2017 |
60 | CHECK AND REPAIR PANEL DC CHARGER | KLIA | KFM SOLUTIONS SDN BHD | 8 MARCH 2017 |
61 | SERVICE TRANSFORMER AND RECALIBRATION RELAY | MENARA GLOMAC DAMANSARA | THP SINAR SDN BHD | 15 MAY 2017 |
62 | TESTING AND COMMISSIONING | PERPUSTAKAAN AWAM NEGERI PAHANG,KUANTAN PAHANG | DASA ELEKTRIK SDN BHD | 18 DEC 2016 |
63 | SUPPLY AND INSTALL INCLUDING TESTING AND COMMISSIONING EARTH FAULT RELAY | KOMPLEKS B, PUTRAJAYA | SERVICE MASTER MALAYSIA SDN BHD | 27 JAN 2017 |
64 | RECALIBRATION PROTECTION RELAY AND SERVICE SUB | MSN BUKIT JALIL & KG PANDAN | MEGAWARNI ENTERPRISE | 22 FEB 2017 |
65 | VCB, TRANSFORMER,TAN DELTA AND CT | KIP MALL BANGI | LANDASAN PRIMAMAJU | 30 MAY 2017 |
66 | MCC SERVICING | KUANTAN | ZONAJAYA SDN BHD | 3 MAY 2017 |
67 | KERJA KERJA PENYELENGGARAAN ASET MAJLIS DI ZON 3 (SEK 20 HINGGA SEK 24 ) SHAH ALAM | MBSA , SHAH ALAM | MAJLIS BANDARAYA SHAH ALAM | IN PROGRESS |
Latest Project
NO | MAIN CONTRACTOR |
JOB DESCRIPTION |
SITE |
1 | Kejuruteraan Letrik KB Sdn Bhd | Retrofitting & rewiring, design for ALTS, IFBT, CTS Control System for 11kV ABB Panel, design and control wiring to suit new HSBT system for tower and Podium substation. | TM, Menara Rebung |
2 | Siemens (M) Sdn Bhd | Rewiring relay and modification panel | MaSteel Bukit Raja |
3 | Hanitek Sdn Bhd | Testing & Calibration of Electrical Protection Relay | KR1, Petronas Penapisan Terengganu |
4 | Hanitek Sdn Bhd | CT Magnetizing Curve Test-PC 1101A&B | MTBE, Kuantan |
5 | Fokus Samudera Sdn Bhd | Proposed Calibration of electrical protective relays and servicing of HV and LV Switchgear | Menara Public Bank, Kuala Lumpur |
6 | Industrial Power Technology Pte. Ltd. | Configuration for P541 differential and interlocking relay end to end (from TNB to BIOMASS) including testing & commissioning | Jengka, Pahang |
7 | ASM Properties | Install brand new 1000A TPN MCCB to existing Capacitor bank c/w alteration and modification of existing cooper busbar | Maju Junction Mall, KL |
8 | Neurah Resources Sdn Bhd | 33kV Pilot Wire Protection relay and end to end testing with trip test and functional test | GPPB- Main Substation |
List Of Offshore & Petronas Project & Sub Project
NO | CLIENT |
SITE |
SUB-CONTRACTOR |
1 | PETRONAS CARIGALI SDN BHD | PCSB-SKO, MIRI | MODERN NEXUS SDN BHD |
2 | ESI BORNEO SDN BHD | FPSO KIKEH, LABUAN | CIRCULITE ENGINEERING SDN BHD |
3 | ASAGA CORPORATION SDN BHD | FPSO ABU | CIRCULITE ENGINEERING SDN BHD |
4 | NEURAH RESOURCES SDN BHD | SOMICODE PROJECT (PETRONAS GPP B) | CIRCULITE ENGINEERING SDN BHD |
5 | ASAGA CORPORATION SDN BHD | ANGSI PLATFORM | CIRCULITE ENGINEERING SDN BHD |
6 | ASAGA CORPORATION SDN BHD | PULAI A PLATFORM | CIRCULITE ENGINEERING SDN BHD |
7 | ASAGA CORPORATION SDN BHD | BEKOK PLATFORM | CIRCULITE ENGINEERING SDN BHD |
8 | CARIGALI OPERATING COMPANY SDN BHD (CPOC) | MUDA FIELD (MLQA), THAILAND | CIRCULITE ENGINEERING SDN BHD |
9 | ASAGA CORPORATION SDN BHD | DUYONG PLATFORM | CIRCULITE ENGINEERING SDN BHD |
10 | ASAGA CORPORATION SDN BHD | MOPU SEPAT PLATFORM | MYTECH SYNERGY SDN BHD |
11 | KENCANA PINWELL SDN BHD | KBB PLATFORM (HIPOT & DUCTOR TEST SERVICE) | HS VOLTECH ENGINEERING SDN BHD |
12 | INFRAKOMAS SDN BHD | TAPIS EOR & REJUVENATION PROJECT TAPIS R INTEGRATED DECK | CIRCULITE ENGINEERING SDN BHD |
13 | VEI POWER DISTRIBUTION (M) SDN BHD | ST. JOSEPH PLATFORM | CIRCULITE ENGINEERING SDN BHD |
14 | KENCANA PINWELL SDN BHD | KBB PLATFORM (RELAY CALIBRATION INCLUSIVE METERING CALIBRATION) | HS VOLTECH ENGINEERING SDN BHD |
15 | EXXON MOBIL | TAPIS A | CIRCULITE ENGINEERING SDN BHD |
16 | MRE POWER TECHNOLOGY | FPSO BERANTAI | CIRCULITE ENGINEERING SDN BHD |
Reach Us
Kindly contact us for any further inquiry.
No. 40, SP 8/4 Bandar Saujana Putra,
42610 Jenjarom, Selangor
03-5161 8337 /
03-5614 3337
contact@circulite.com.my